Snow Load Calculator — Roofs That Carry Winter, Not Just Weight

Estimates the design snow load on a steel roof from sk = μr · s0 (GB 50009-2012) using the roof shape factor for your pitch geometry, with the EN 1991-1-3 shape-coefficient method shown alongside for export verification. Snow rarely falls evenly — the code's drift, slide and accumulation cases are where small roofs fail, so the calculator includes the shape logic and the commentary explains where the real load concentrates.

Live Calculator

Design Snow Load on the Roof

Enter the site's 50-year ground snow pressure and the roof geometry. The shape factor follows GB 50009-2012 Table 7.2.1 for the selected roof family.

Inputs — Site Climate and Roof Geometry

Beijing 0.40 • Harbin 0.45 • Shenyang 0.50 • Urumqi 0.60 kN/m² (GB 50009 App. E, typical values)

0 for flat; affects μr once α > 25°

μr (GB)
1.00
sk (kN/m²)
0.40
Roof Total (kN)
576

At selected density the snow depth equivalent: sk / (ρ·g) ≈ 0.41 m of snow cover.

How to read the results

sk is the characteristic snow load on the projected (plan) roof area — codes load the horizontal projection, not the sloped surface, and the shape factor adjusts for how snow sits on your particular roof. For a flat or low-pitch roof (α ≤ 25°) the factor is 1.0: the full ground value acts on the roof. Above 25° the factor falls (snow slides), and at α = 50° a gable roof reaches μr = 0.0 under GB 50009 — but the sliding snow then accumulates on the lower roof or at eaves, which the two-level drift case captures.

sk = μr · s0  (GB 50009-2012 §7.1.1)

EN 1991-1-3 cross-check: the equivalent European load is s = μi · Ce · Ct · sk, where Ce (exposure, typically 1.0) and Ct (thermal, 1.0 for insulated roofs) bracket the same physics as the Chinese factor, and μi starts at 0.8 for low-pitch roofs (versus GB's 1.0) — a real difference, not a tolerance. When we design an export roof to EN, the European shape coefficients (with their 0.8 < μ < 0.8–1.6 drift range) govern, and the GB value is used as a check. Always tell your fabricator which code governs: the same roof about 20–25° pitch can be ~20% lighter or heavier depending on the national annex.

Partial snow and rain-on-snow: codes require the check of drifted (asymmetric) snow on duo-pitch roofs — one slope at μr, the other at 0.5 μr — because a purlin or truss sized only for uniform load derates when the unloaded slope relieves its neighbour. Our design reports always include the asymmetric case for gable roofs and the drift case for stepped buildings; this is where a "standard" steel package from a supplier who skips the drift case quietly under-designs the splice.

Shape Factor Guide

Roof Shape Factor μr — GB 50009-2012 Table 7.2.1

Roof Geometry Shape Factor μr Design Note
Flat / single-pitch, α ≤ 25° 1.0 Full ground load on plan area; governing for most industrial roofs
Duo-pitch, α between 25° and 50° 1.0 → 0.6 linear Interpolate μr = 1.0 − 0.4×(α−25)/25; plus asymmetric case
α ≥ 50° 0.0 (gable) / 0.2 minimum Snow slides; check eaves accumulation and valley drift instead
Two-level / stepped roof 1.0 + drift wedge (up to ~2.0) Drift forms at the step when wind sweeps the upper roof; triangular wedge over the lower roof
Arched / curved roof 0.5 – 0.8 by f/l ratio Snow redistributes from crown to haunches; check both distributions

Worked example: 24 m × 60 m gable warehouse in Shenyang

Shenyang ground snow s0 = 0.50 kN/m². Roof pitch 8° → μr = 1.0, so sk = 0.50 kN/m². At a frame spacing of 6 m, each portal frame picks up a roof band of 6 m × the 12 m half-width = 72 m² → sk × 72 ≈ 36 kN of snow per frame, distributed as a uniform vertical load on each rafter — roughly three times the dead load of the frame itself. Adding the asymmetric case (one slope 0.5 μr) and the wind-uplift combination, the rafter and eave connection are designed for the worst admissible envelope. This is exactly the arithmetic behind every "snow region" price premium in steel quotations — now you can run it yourself before you ask us to.

Why the drift case decides the splice

The classic failure: a steel warehouse with a tall monitor or a higher adjacent hall — the upper roof's snow slides and drifts into the step at the lower roof, piling up in a wedge that can exceed 2× the ground value over several metres of lower roof. The lower-roof purlins and the column at the step see a load the flat-roof assumption never included. Whenever possible we detail a transition detail (aerated parapet, snow fence, or a steepened lower slope) precisely so the code's drift case does not govern; when it does govern, the members are sized for it — both are engineering decisions, and we document which one we made and why.

Load Combinations

Combining Snow With Wind — the Envelope, Not the Peak

  • Gravity governs at the mid-span: for a flat roof the governing combination is usually 1.2×Dead + 1.4×Snow (GB) or 1.35×G + 1.5×S (EN) — the rafter, purlin and splice all size up for it.
  • Uplift governs at the eaves and edge zones: wind suction on the roof field (see the wind load calculator) can exceed the snow + dead combination locally, particularly in the corner zones. The bracing and anchorage must hold the roof down against the suction case where uplift dominates.
  • Rain-on-snow surcharge: for low-pitch roofs (< 5°) certain codes add a rain-on-snow surcharge during thaw. We include the case where the code requires it, and we check the drainage design so ponding cannot accumulate a secondary load on an already loaded span.
  • Long-span sensitivity: on 100 m+ grids and trusses, the snow pattern (uniform, drifted, partial) is checked member by member: a drift over the crown can produce local hogging moments the uniform case never creates. This is why large-span snow loads in our reports are always accompanied by the load-pattern diagrams, not a single number.

Design for snow — checklist your steel supplier should answer

1) Which national code governs (GB 50009, EN 1991-1-3, ASCE 7-22) and what is the design sk for your city? 2) Which shape factors were applied, and were the asymmetric and drift cases run? 3) How were wind + snow combined per the governing code's partial factors? 4) What is the snow load at the eave, the ridge and the step (if any)? 5) Is the roof drainage designed so ponding cannot add load on top of snow? If a quotation answers all five with numbers — and not with "standard design" — you are talking to an engineer. That is the standard Permanent Steel holds on every project, and the same numbers you can reproduce with the calculator on this page.

Send us the city, roof geometry and code — we return the snow case (uniform + drift + asymmetric) with the frame budget in 24 hours.

Roofs Engineered for the Snow It Actually Gets

Send us the city, roof geometry and governing code — we return the uniform, drifted and asymmetric snow cases with member implications, plus the frame budget that goes with them.

Email: market@permanentsteelstructure.com  |  WhatsApp: +86 18621689980  |  Phone: +86 516-83269982