Space Frame Node Specifications — The Joint Is the Structure

A bolted sphere node connects up to eleven members from nine directions into one hot-dip-galvanised steel ball; a welded hollow ball joint carries it further where loads are heaviest. In a space frame, the node is not a detail — it is the entire argument: every member's force resolves through it, every tolerance error concentrates in it, and every construction saving depends on it. We have manufactured millions of nodes since 1999, and the specification below reflects the limits and locks the quality.

11
Max Members per Node
BS255
Ball Steel Grade
Φ48-Φ219
Member Range
40Cr
High-Strength Bolts
GB 50017
Design Code
Node Types

Bolted-Sphere vs Welded-Hollow-Ball: Choosing the Right Joint

Bolted sphere nodes suit the majority of roofs and floors up to roughly 80-100 m span: the structure breaks down into members with pre-tensioned high-strength bolts at each end and screw into a hot-forged steel ball. Site erection becomes a bolting operation — no welding on scaffolding, no fire risk at height, simple inspection of every joint — which is why bolted grids dominate stadium roofs, exhibition halls and industrial canopies where speed and ease of erection decide the programme.

Welded hollow-ball nodes take over where forces grow too large for a bolted connection: heavy industrial roofs, coal-storage domes at 100-229 m span, and structures carrying concentrated equipment loads. The members weld directly to a pressed steel hollow ball, giving a stiffer joint with no bolt slip and higher force capacity — at the cost of site welding and inspection. Our 229 m world-record coal shed and its 100 m+ industrial domes are welded-ball systems.

For both systems, the node is designed and checked to GB 50017 node rules (and cross-checked to the client's reference code where the project requires), and every batch of balls is tested for hardness, chemical composition and weldability before it reaches the nesting table.

Bolted-Sphere Data

Bolted Sphere Node — Standard Parameters

Parameter Typical Range Standard / Note
Ball diameterΦ100 – Φ320 mm (bs-100 to bs-320 series)Machined from forged blanks, BS255 per GB/T 699
Ball material45# steel, BS255 ball grade, heat-treatedSurface hardness 260-280 HBW after quenching & tempering
Bolt grade40Cr (M20-M64), 35CrMo (M64+)Grade 10.9 high-strength, GB/T 1228-1231 torque control
Member connectionΦ48×3.5 to Φ219×20 steel tubeSleeve + set screw + taper pin, full thread engagement
Thread tolerance6H/6g threads, 1.25-1.5×d thread lengthThreads checked with ring/go gauges batch-wise
Member-to-ball fitTapered sleeve packs the gapMin 65% thread engagement per design
Corrosion protectionHot-dip galvanizing 60-85 µm (interior) / 85-120 µm (coastal)ISO 1461; threads masked & re-cut after galvanizing
ErectionTorque wrench, no site weldingTorque values per bolt grade stamped on shop drawing

Design input per GB 50017-2017 Chapter 12 (node design) and JGJ 7 space grid code; capacities include the bolt-slip and node-rotation limits, not just the member-end resistance.

Welded-Ball Data

Welded Hollow-Ball Node — Standard Parameters

Parameter Typical Range Standard / Note
Ball diameterΦ200 – Φ1200 mmPressed and welded hemispheres, two-piece assembly
Wall thickness8 – 40 mmDesign-checked for local buckling at the member junction
MaterialQ355B, Q390B, Q420B steelDesign yield per GB/T 1591; Charpy tested ≤ -20°C where required
Member connectionΦ89 to Φ711 tubular members, full-penetration butt weldWeld QC: visual + UT per ISO 17640 Level B on tension members
Eccentricity controlDesign eccentricity ≤ 0.25 times ball outer diameterPer GB 50017 node eccentricity rules
Bearing capacity basisBall node axial and shear capacity per formula in JGJ 7-2010Verified by FEA on high-loaded nodes (>200×10³ kN)
Corrosion protectionHot-dip galvanizing or duplex / intumescent per exposureISO 12944 C3/C4/C5 system selection by project site

The 229 m world-record beam-string coal shed and the 100 m+ industrial domes we have delivered are welded-hollow-ball systems; every node's capacity was FEA-verified at design stage and its weld inspected during fabrication.

Quality Control

What Guarantees a Node Before It Leaves the Factory

Bolted sphere node space frame roof installed by Jiangsu Permanent Steel Structure
  • Mill test certificates for every ball blank, bolt lot and tube batch — traceable to the node by heat number.
  • Batch hardness and chemical checks on sphere blanks before machining; ball surface defects rejected at nesting inspection.
  • Thread verification with ring and plug gauges; bolt lot testing per GB/T 1231 including hardness and wedge-load tensile tests.
  • Welded-ball NDT: 100% visual of all welds, UT per ISO 17640 Level B on tension-loaded member welds, with MPC recorded.
  • Fit-up trial of node + members for the first structure of every project before bulk shipment — a trial jig that catches geometry errors while they are still cheap.
  • Galvanizing thickness reports per ISO 1461 with thickness spot checks at the ball surface and thread re-cut verification.
Design Collaboration

How We Specify Your Nodes

Send us the roof geometry, loading and span and we return a node specification that matches the real force flow — not a catalogue guess:

  • Node force envelope from the grid analysis (axial design force, node displacement) at the worst-loaded nodes.
  • Ball size and bolt selection per the governing compression/tension at each node, with the slip and rotation check documented.
  • Member-nesting and thread-length drawings released for fabrication review before the first ball is machined.
  • Erection method statement covering torque control (bolted system) or site weld QC and inspection (welded system).
  • Cross-code options: where the consultant works to Eurocode, AISC or a national code, the node check is translated to the reference code with equivalence notes.

Every node shipped includes its identity marking matching the shop drawing — your erector knows exactly which ball goes in which node, and your inspector can trace any one of them to its steel.

Specify Nodes With the Numbers, Not Guesswork

Send us your grid geometry, loads and span. We return a node specification with ball sizes, bolt grades, capacities and a fabrication drawing review — designed to your code, traceable to its steel.

Email: market@permanentsteelstructure.com  |  WhatsApp: +86 18621689980  |  Phone: +86 516-83269982