Qinling Station Opens on Ross Sea — Built as a Fully Assembled Steel Structure
On 7 February 2024, China's fifth Antarctic research station — Qinling Station (74°56′S, 163°42′E) — officially opened on Inexpressible Island, Ross Sea. The station's main building was erected using a fully assembled steel structure with module-prefabricated interior units (modularisation rate 45%), a design that had to withstand extreme cold, katabatic winds and high UV radiation. The public record confirms the station building area of approximately 5,244 m² with capacity for 80 summer and 30 winter personnel.
Our company was the steel structure contractor for the Qinling Station project — the same team that delivered the Ross Sea New Station steelwork. The experience directly informs our low-temperature welding and arctic-grade coating specifications.