Verified Project Delivery Records — 30+ Countries, Every Structure Standing
These are delivery records from completed projects — not anonymous star ratings. Every structure below is standing today, every inspection document is retained in our archive, and every buyer can request the underlying evidence: mill test certificates, NDT reports, third-party inspection records, and reference site visits.
Project Files from Six Continents
Hydropower in Pakistan, a 250,000 m² coke plant in Indonesia, an airport in the Republic of the Congo, and three landmark projects in China. Each file below states what was contracted, what was delivered, and what the inspection record shows.
Tarbela Hydropower Station
Hydropower Infrastructure · Pakistan
2,000+ tonnes of welded pipe trusses for the Tarbela hydropower project were fabricated in Xuzhou and shipped through Karachi port in three shipments, each matched to the agreed fabrication schedule down to the week. Every truss shipped with a complete documentation pack: material test certificates traceable to heat numbers, UT reports on the full-length longitudinal welds, and shop drawings in English that the client’s consultant approved without a single round of clarifications.
When the erection crew needed advice on lifting 36-meter trusses in high wind conditions, our site support team joined daily coordination calls and issued a revised two-stage lifting sequence within 48 hours. The structure was closed out on schedule, and the same client referenced us for the next phase. Dispatch photos, loading plans, and inspection records from this project remain available in our archive for client-side engineers.
Indonesia Jinrui New Energy Coke Plant
Industrial Energy · Indonesia
The Jinrui New Energy coke plant complex covers 250,000 square meters, and the structural steel budget was one of the largest line items of the whole investment. Our quotation broke the scope into steel material, fabrication labor, surface treatment, packaging, and inward freight — every line item open for audit — and that transparency held through the contract: when steel plate prices moved, the mill price change was shown with source documentation instead of a quiet adjustment to a lump sum.
Members were inspected at three checkpoints — cutting, assembly, and after blast-cleaning — and dimensional deviations were photographed and logged before galvanizing. Across the first 5,000 tonnes, three minor issues were identified, all corrected before shipment. The plant is now operating, and a phase-two scope is under discussion with the same owner. Inspection records for each checkpoint are filed against the member mark numbers and can be provided on request.
Airport of the Republic of the Congo
Airport Infrastructure · Central Africa
For the airport terminal structural package — 1,200 tonnes of columns, trusses, and purlins shipped to Central Africa — export packaging and documentation were treated as part of the deliverable, not an afterthought. Every member was individually wrapped with VCI anti-corrosion film, bundle labels matched the packing list item by item, and the customs file included certificate of origin, packing lists, and mill certificates in a form the client’s clearing agent could process without follow-up calls.
Two of our engineers flew to Brazzaville for the first three weeks of erection and worked with the local crew, training them on the high-strength bolt tightening sequence and the grid lifting procedure. Support continued until the local team could erect an entire bay without supervision. The roof closure was completed ahead of programme, and the anti-corrosion and packaging specifications from this export are retained as executed-project records.
SINOTRUK Heavy Truck Assembly Workshop
Industrial Manufacturing · China
The 77,000 m² heavy truck assembly workshop had to be delivered inside a 15-month window with the production line installation following our erection crew bay by bay — a schedule with almost no float. The double-layer bolted sphere grid roof over the main assembly hall, roughly 150 m by 400 m in plan, was designed and supplied by us, and the fabrication sequence was managed so that each batch of members arrived on site in the order the crew erected them, not in production order.
Node coordinates were verified against the shop drawings on a CMM before shipment, which is why the ball nodes mated first time, bay after bay. The roof was closed, handed over to the cladding contractor, and equipment installation started exactly on programme. The fabrication-sequence plan and CMM verification reports for this workshop are retained and can be presented as reference evidence.
GAC New Energy Production Expansion
Automotive Manufacturing · China
The new-energy vehicle stamping and assembly halls had to clear 85 meters without intermediate columns — the width the production line and its logistics corridor demand. At that span the double-layer grid structure is a deflection problem as much as a strength problem; tolerances on node geometry are unforgiving. We handled design coordination with the client’s consulting engineer directly, and the full-penetration butt welds passed 100% of ultrasonic testing, with welders qualified to the EN 1090 procedure requirements specified by the client.
Because the grid was prefabricated in large sub-assemblies, approximately 60% of the 85,000 m² roof was erected in pre-assembled panels rather than piece by piece, cutting site welding by thousands of joints and shortening the critical path by about a month. Production trials started on schedule, and the structure has carried full plant loads through two typhoon seasons without a single reported issue. UT records and the pre-assembly lifting plan are part of the project archive.
Xuzhou High-Speed Railway Station
Transport Infrastructure · China
A high-speed railway station cannot stop operating while its roof is being built. The 75-meter span grid dome over the Xuzhou station hall was erected above a live concourse, which made every lifting plan a safety review in itself. The same company held the contracts for manufacturing and site installation, giving the client a single accountable party for the interface between shop tolerance and site fit.
Construction was planned around low-traffic night windows, and temporary support towers were removed progressively as the dome carried its own weight. Site safety management recorded zero incidents over the entire roof erection, and every weld was inspected before the support towers moved. The completed structure passed final acceptance on the first inspection with no non-conformities. The lifting-sequencing plan and acceptance records for this dome are retained in our project archive.
Proven Across Industrial, Infrastructure, and Public Buildings
Representative projects in the three sectors that make up most of our export demand.
Factories, workshops & energy plants
SINOTRUK heavy truck assembly workshop (77,000 m²), GAC new-energy expansion (85,000 m²), Indonesia Jinrui New Energy coke plant (250,000 m²), Guodian Ningxia enclosed coal shed (229 m world-record span), Guangdong Huizhou Port Quanwan coal yard.
Transport, energy & extreme environments
Pakistan Tarbela Hydropower Station, Xuzhou High-Speed Railway Station (75 m grid dome), Daqing West Railway Station, QATAR Faculty of Islamic Studies, Antarctic Ross Sea New Station — fabricated for −40°C low-temperature service.
Airports, museums & exhibition centers
Airport of the Republic of the Congo (1,200 t export), Guangzhou Baiyun International Airport Phase III, Fuzhou Strait Exhibition Center, National Maritime Museum of the South China Sea, Hangzhou Kaiyuan Senbo Hotel.
Five Client Categories, One Delivery Standard
Procurement criteria differ by owner type - qualification pre-audits, material traceability, export documentation, or erection sequencing. One standard applies across all: the delivered structure must fit, pass inspection, and stand.
EPC & general contractors
Pre-qualification audits, full material traceability, GB / AWS / EN compliance, and fabrication sequence matched to site erection order.
Power & energy operators
Thermal cycling, coal-dust exposure and seismic loading - including the 229 m world-record single-span coal shed.
Rail, airport & municipal
Erection windows measured in hours, seismic isolation detailing, and visual quality for gateway public infrastructure.
Manufacturing enterprises
Column-free spans over 30 m, crane capacities of 50+ tonnes, and structures that follow production-line installation, bay by bay.
Owners & EPCs abroad
Export-grade documentation, AISC / EN 1090 / AS 4100 compliance, containerised shipping, and on-site engineer support.
See the full partnership model
Design-institute coordination, general-contractor integration, and logistics partners for oversized steel cargo.
Three Ways to Check the Evidence Behind the Numbers
A delivery record is only as useful as its verifiability. We have structured the evidence so each claim on this site can be checked independently - before you sign a contract.
Request the Evidence Pack
Ask for mill test certificates traceable to heat numbers, NDT reports, pre-shipment photos, and loading plans from the project files above. For a model of what to request and how to read it, download our EPC steel procurement checklist.
Cross-Check Independent Certifications
The Luban Prize, Steel Structure Gold Award, National High-Tech Enterprise, and six Special-Grade licenses were granted by third-party committees, not self-declared. Browse our awards and qualifications pages.
Visit the Workshop or a Completed Structure
Our Xuzhou facility hosts 100,000 m² of production workshops across eight lines. Third-party inspectors are welcome at any production stage, and reference visits to completed structures can be arranged through our engineering team.
Why Clients Choose Permanent Steel Structure
Four structural reasons appear again and again in client feedback — and they are all built into our operating model, not our marketing language.
Direct from Factory, No Middleman
You contract with the company that operates the CNC lines. One warranty, one accountable party, one technical team — the single point of responsibility clients highlight in every review above.
25 Years of Export Experience
Exporting since 1999 means our documentation, packaging, and logistics procedures have been hardened by thousands of shipments — to congested ports, tropical climates, and Antarctic conditions.
EN 1090-Compliant Fabrication
Welding procedures and personnel qualified to EN 1090, with fabrication also available to AISC, BS, and GB standards. Third-party inspectors are welcome at any stage of production.
Installation Experience in 30 Countries
We do not hand over drawings and disappear. On-site or remote erection support from engineers who have solved lifting, alignment, and bolting problems on five continents.
Join 500+ Satisfied Clients — Start Your Project
Send your drawings, specifications, or a concept sketch. Our engineers respond within 24 hours with a feasibility assessment and a factory-direct quotation — the first step of the same process these clients went through.
Request a Factory-Direct Quote Browse Reference Projects